The Assessment

One honest read, end to end.

Document review, three to five days on site, then analysis and scoring across the framework. You learn what’s working, where your gaps are, and whether the systems protecting your people still hold — delivered as a Scorecard your leadership team can budget against.

The Process

The Scorecard is the product.

Five to seven weeks. Three to five days on site. A 45-to-70 page Scorecard delivered as a professionally typeset PDF, walked through in a 90-minute leadership readout, with a 30-day clarification window included.

i.

Pre-engagement preparation

Document review, scope confirmation, interview planning.

2–3 wks

ii.

On-site engagement

Structured interviews, utility walkthroughs, document review on the floor.

3–5 days

iii.

Analysis & scoring

23 modules scored, domain rollups, Critical Threshold Flag evaluation, Roadmap built.

1–2 wks

iv.

Delivery & readout

Scorecard delivered, 90-minute leadership readout, 30-day clarification window.

1 week

The Scorecard

What’s inside.

Professionally typeset PDF, 45 to 70 pages depending on facility size and findings. Built to be read by your leadership team, budgeted against, and acted on. Not built to sit in a drawer.

01  Cover & Critical Findings

Leadership-level view of where the facility stands and what fires the framework’s flags.

03  Domain Summaries

All six domains with rollup scores, posture commentary, and the modules driving each domain’s read.

05  Prioritized Roadmap

Five tiers with specific near-term actions, named ownership, and progress indicators. Built to be budgeted against.

07  Evidence Log

Every finding tied to specific evidence. Defensible against pushback. Readable across leadership transitions.

02  Executive Summary

Domain-level posture and headline findings — written for the audience reading on a flight.

04  Module Write-Ups

One per scored module — 23 in total. Evidence, current-state observations, path to the next maturity level.

06  Loss Matrix · Appendix A  New v2

Dollar-ranked Pareto of the top facility-caused losses identified during engagement, linked to the modules that drive them. Translates reliability findings into the financial terms your capital prioritization conversation already runs on.

08  Scoring Criteria & Methodology

Reference appendices covering scoring criteria and domain rollup methodology, including the floor-based safety rollup.

Let’s talk about where your facility stands.

The framework only matters if it gets used. A thirty-minute conversation is the lightest possible way to see whether an Assessment fits your facility and your planning horizon.

Prefer to write? Contact →